MirZnaet.ru

Лучшее из переведенного

Построение настила просмотров: 807





















Work place TI



RostSelmash



 



Product designation



Mass of the product, kg.



Workshop 030



Name of the product



Covering



Area 06



 












































































































































































































































































































































































































































































































































































































































































































































































 



Device for stud retainers (2 people)



 



 



8



Tamp till full detail conjugation with 3-4 hammer blows



 



 



9



Establish assembly unit position 4 on prisms of the device



 



 



10



Tamp till full detail conjugation with 3-4 hammer blows



 



 



11



Fix in the device the detail position 4 with the help of 2 sliding pins grounding them by the hole in the assembly unit position 4 changing over 2 metres tamping 7-10 blows with the hammer



 



 



12



Fix assembly unit position 4 with folding clamps arcs (2 elements of mount) with changing over to 2 metres tamping 7-10 blows with the hammer



 



 



13



Establish the detail position 10 in the device on detail position 28 by stud retainer (3-5 blows)



 



 



14



Change over 2 metres



 



 



15



Establish the detail position 10 on assembly unit assembled in the operation 015 by stud retainers (3-5 blows)



 



 



16



Tamp till full detail conjugation with 3-4 hammer blows



 



 



17



Fix assembly unit position 4 with screw clamp (4 elements of mount: 2 by 27 turns, 2 by 38 turns) with changing over into 2 metres tamping 7-10 blows with the hammer (pace 5,5 mm, length 200 mm)



 



 



18



Establish the detail position 8 on assembly unit assembled in the operation by the template № 1 (Lш = 700 mm)



Template № 1 of  the device



 



19



Establish assembly units (2 units) on assembly unit assembled in the operation 015 by the template (Lш = 250mm), fixing the template on the hole in the assembly unit assembled by the operation 015 and in the holes of the assembly unit position 1 (2 units) tamping 7-10 blows with the hammer



 



 



20



Establish the details of position 22, position 23 on the assembly unit assembled in the operation 015 by the template fixing the template on the hole in the assembly unit assembled gathered in the operation 015 and the details position 22, 23 by grooves of the device tamping 7-10 blows with the hammer Lш = 700 mm



 



 



21



Establish the detail position 20 on the assembly unit assembled in the operation 015 by the groove of hinged clamp of the device till the conjugation with the details position 22 and position 23 (7-10 blows)



 



 



22



Tamp till full detail conjugation with 3-4 hammer blows



 



 



23



Fix in the device the detail position 20 with the help of sliding clamp



 



 



24



Establish the detail position 26 in the device on the detail position 10 by stand retainer



 



 



25



Establish locking device on the detail position 26 by the hole Lш = 150 mm



 



 



26



Fix assembled details with removable screw clamp (35 turns) (pace 5,5 mm, length 150 mm)



 



 



27



Change over 2 metres



 



 



28



Establish second detail position 26 in the device to lock



 



 



29



Establish locking device on the detail position 26 by the hole



 



 



30



Fix the details assembled with removable screw clamp (35 turns)



 



 



31



Grab the detail position 10 to the assembly unit assembled in the operation 015



Flap HH C – 705 У1 Standard 12.4.035-78


Pliers 78-14-0161 Standard 5547-93



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric connection, mm



32



Grab the detail position 10 to the detail position 4



 



 



Stitch type



H1



Sp



H



Sl



10



NS



2



CS



3



DEC



 



33



Change over 2 m



 



 



34



Grab the detail position 11 to the assembly unit assembled by the operation 015



 



 



Stitch type



H1



Stitch postion



H



Stitch length, mm



10



Number of stitches



2



Catheus of the stitch



3



Diametre of electric connection, mm



 



35



Grab the detail position 11 to the detail position 4



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



2



Cathe tus of the stitch



3



Diametre of electric connection , mm



 



36



Press pedal of the arresting device and unfix the device



 



 



37



Turn the device on 180 grade round


vertical ace holding the pedal of the


arresting device pressed



 



 



38



Fix the device by tempering the pedal of the arresting device



 



 



39



Grab the detail position 4 to the assembly unit assembled in the operation 015



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



3



Diametre of electric connection, mm



 



40



Grab one detail position 1 to the assembly unit assembled in the operation 015



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



3



Diametre of electric connection, mm



 



41



Grab the second detail position 1 to the assembly unit assembled in the operation 015



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



3



Diametre of electric onnection, mm



 



42



Grab the detail position 18 to the assembly unit assembled in the operation 015 on both sides



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



6



Cathetus of the stitch



3



Diametre of electric connection, mm



 



43



Grab the detail position 22 to the assembly unit assembled in the operation 015



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric connection



 



44



Grab the detail position 23 to the assembly unit assembled in the operation 015



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



3



Diametre of electric connection, mm



 



45



Grab the detail position 20 to the assembly unit assembled in the operation 015 on both sides



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



8



Cathetus of the stitch



3



Diametre of electric connection, mm



 



46



Detach screw clamp (35 turns) of the locking device



 



 



47



Take off the locking device bringing to the warehousing site



 



 



48



Change over  2 metres



 



 



49



Detach screw clamp (35 turns) of the second locking device



 



 



50



Take off the locking device bringing to the warehousing site



 



 



51



Establish one detail position 15 on the detail position 18 till conjuncture with one assembly unit according to the scheme



 



 



52



Establish another detail of position 15 on the detail of position 18 till conjuncture with one assembly unit according to the scheme



 



 



53



Fix the details assembled with removable screw clamp (10 turns)



 



 



54



Press pedal of the arresting device and unfix the device



 



 



55



Turn the device on 180 grade round


vertical ace holding the pedal of the


arresting device pressed



 



 



56



Fix the device by tempering the pedal of the arresting device



 



 



57



Take off the model № 2 and put on a table



 



 



58



Grab one detail of the position 15 to the detail of the position 18 and to the assembly unit of the position 1



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



2



Cathetus of the stitches



3



Diametre of electric connection, mm



 



59



Grab another detail of the position 15 to the detail of the position 18



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



5



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric connection, mm



 



60



Grab another detail of the position 15 to the essembly unit



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



5



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric connection, mm



 



61



Press pedal of the arresting device and unfix the device



 



 



62



Turn the device on 180 grade round


vertical ace holding the pedal of the


arresting device pressed



 



 



63



Fix the device by tempering the pedal of the arresting device



 



 



64



Take off the model № 1 and put on a table



 



 



65



Grab the detail of the position 23 to the detail of the position 18 and of the position 20



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



10



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric conection, mm



 



66



Grab the detail of the position 23 to the detail of the position 18 and of the position 20



 



 



Stitch type



H1



Stitch position



H



Stitch length



10



Number of stitches



2



Cathetus of the stitch



3



Diametre of electric connection, mm



 



67



Change over 2 metres



 



 



68



Press pedal of the arresting device and unfix the device



 



 



69



Turn the device on 180 grade round


vertical ace holding the pedal of the


arresting device pressed



 



 



70



Fix the device by tempering the pedal of the arresting device



 



 



71



Freeze the detail of the position 10 to the detail of the position 4 with the stitch № 1



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



297



Number of stitches



1



Cathetus of the stitch



2



Diametre ao electric connection, mm



 



72



Freeze the detail of the position 10 to the detail of the position 18 with the stitch № 6



 



 



73



Freeze the detail of the position 10 the assembly unit assembled in the operation 015 with the stitch № 1



                    



 



Stitch type



T1



Stitch position



H



Stitch length, mm



200



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



74



Change over 2 metres



 



 



75



Press pedal of the arresting device and unfix the device



 



 



76



Turn the device on 180 grade round


vertical ace holding the pedal of the


arresting device pressed



 



 



77



Fix the device by tempering the pedal of the arresting device



 



 



78



Freeze the detail of the position 11 to the assembly unit with the stitch № 1



 



 


                                                                                                                 































































































































































































































































































































































































































































Stitch type



T1



Stitch connection



H



Stitch length, mm



297



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



79



Freeze the detail of the position 11 to the detail of the position 18 with the stitch № 6



 



 



Stitch type



Y4



Stitch connection



H



Stitch length, mm



200



Number of stitches



1



Cathetus of the stitch



2



Diametre of electri connection, mm



 



80



Freeze the detail of the position  11 to the assembly unit in the operation 015 with the stitch № 1



 



 



Stitch type



T1



Stitch connection



H



Stitch length, mm



200



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



81



Freeze the assembly unit of the position 4 to the assembly unit to assembly unit assembled in the operation 015 with the stitches № 4 (30/100) with the transition during the process of the freezing to 1, 2 metres



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



30



Number of stitches



17



Cathetus of the stitch



5



Diametre of electric connection, mm



 



82



Freeze one assembly unit of the position 1to the assembly unit assembled in the operation 015 with the stitch № 3



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



225



Number of stitches



1



Cathetus of the stitch



3



Diametre of electric connection, mm



 



83



Freeze another assembly unit of the position to the assembly unit assembled in the operation 015 with the stitch № 3



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



225



Number of stitches



1



Cathetus of the stitch



3



Diametre of electric connection, mm



 



84



Freeze one assembly unit of the position to the assembly unit of the position 4 with the stitch № 1



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



64



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



85



Freeze another  assembly unit of the position 1 to the assembly unit  of the position 4 with the stitch № 1



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



64



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



86



Freeze the detail of the position 18 to the assembly unit assembled  in the operation 015 with the stitch № 3 (30/100) from the middle of till the edge beginning with another side



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



30



Number of stitches



5



Cathetus of the stitch



3



Diametre of electric connection, mm



 



87



Freeze the detail of the position 18 to the assembly unit assembled in the operation 015 with the stitch № 3 (30/100) from the middle of till the edge beginning with another side



 



 



Stitch type



H1



Stitch position



H



Stitch length, mm



30



Number of stitches



5



Cathetus of the stitch



3



Diametre of electric connection, mm



 



88



Freeze the detail of the position 18 to the assembly unit assembled in the operation 015 from the side of the detail of the position 22 with the stitch №2 (30/100)



 



 



Stitch type



Y2



Stitch position



H



Stitch length, mm



30



Number of stitches



5



Cathetus of the stitch



3



Diametre of electric connection, mm



 



89



Freeze the detail of the position18 to the assembly unit assembled in the operation 015 from the side of the detail of the position 23 with the stitch № 2 (30/100)



 



 



Stitch type



Y2



Stitch position



H



Stitch length, mm



30



Number of stitches



5



Cathetus of the stitch



3



Diametre of electric connection, mm



 



90



Grab the detail of the position 28 to the detail of the position 10 in 3 places



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



2



Diametre of electric connection, mm



 



91



Grab the detail of the position 26 to the detail of the position 10 in 3 places



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



2



Diametre of stich connection



 



92



Change over 2 metres



 



 



93



Grab the second detail of the position 28 to the detail of the position 10 in 3 places



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



2



Diametre of electric connection, mm



 



94



Grab the second detail of the position 26 to the detail of the position 10 in 3 places



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



10



Number of stitches



3



Cathetus of the stitch



2



Diametre of electric connection, mm



 



95



Freeze the detail of the position 11 to the position 4  with the stitch № 1



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



297



Number of the stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



96



Freeze the detail of the position 11 to the assembly detail assembled in the operation 015 with the stitch № 1



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



200



Number of stitches



1



Cathetus of the stitch



2



Diametre of stitch connection, mm



97



Freeze the detail of the position 11 to the detail of the position 18 with the stitch № 6



 



Stitch type



Y4



Stitch position



H



Stitch length, mm



200



Number of stitches



1



Cathetus of the stitch



2



Diametre of stitch connection, mm



98



Change over 2 metres



 



99



Freeze the detail of the position 10 the assembly unit assembled in the operation 015 with the stitch № 1



 


                                                                                                         


















































































 



Stitch type



T1



Stitch position



H



Stitch lengt, mm



200



Nimber of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



 



100



Release assembly unit from screw clamp (2 elements of the binding by 36 turns) with the transition to the second metre



 



 



 



101



Freeze the detail of the position 26 to the detail of the position 10 with the stitch № 1



 



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



190



Number of stitches



1



Cathetus of the stitch



2



Diametre of electric connection, mm



 



 



102



Freeze the detail of the position 26 to the detail of the position 10 with the stitch № 1



 



 



 



Stitch type



T1



Stitch position



H



Stitch length, mm



220



Number of stitches



1



Cathetus of the stitc



2



Diametre of electric connection, mm



 



 



103



Change over 2 metres



 



 



 



104



Freeze the detail of the position 28 to the detail of the position 10 with the stitch № 1



 



<

- 0 +    дата: 13 марта 2016

   Загружено переводчиком: Юлия Викторовна Биржа переводов 01
   Язык оригинала: английский